The aim of the sampling is to accumulate enough contaminant mass to determine the isotope fingerprinting of various contaminants in the laboratory.
How to overcome (apparent) conflict of interests? (15.07.2010)
Direct-push techology was used in Slovenia first time (06.07.2010)
INCOME among the students (26.05.2010)
First INCOME leaflet has been issued (01.04.2010)
Presentation of project INCOME on “Fair of experiences of waters” (26.03.2010)
Field work continues (26.03.2010)
The broadcast about INCOME project on radio »Europa« (01.02.2010)
In scientific journal “Geologija” two articles have been published (11.01.2010)
Sampling campaign (26.11.2009)
Groundwater sampling (09.10.2009)
The article about INCOME project has been published in the Environment & Spatial Planning Bulletin (30.09.2009)
1. Presentational press conference for the project INCOME (14.09.2009)
1. Monitoring event of INCOME project (24.08.2009)
The overview of the groundwater wells (03.08.2009)
Project presentation (15.06.2009)
4th meeting of INCOME project group (15.06.2009)
The inventory of pollutants (02.04.2009)
Foundation for the base of geological hydrological, chemical, and other data (31.03.2009)